Negosyo Kit
NEGOSYO KIT · 6 EXTRA PERMITS

Permits for a gasoline station

Home › Business kits › Stores and retail

A gasoline station is regulated by the Department of Energy before it sells a single litre. Under DOE Department Circular 2003-11-010, you must notify the DOE Oil Industry Management Bureau in writing, and you cannot operate until DOE issues a Certificate of Compliance. Operating without one counts as illegal trading. The lot must be at least 100 square metres, with vehicles served inside the premises.[1]

Gas station prep list

  • Confirm the lot is at least 100 square metres
  • Make sure vehicles can be served inside the lot
  • Write your notice to DOE-OIMB with a business plan
  • Start the ECC and zoning clearance before construction
  • Ask the LLDA if your site needs a discharge permit
  • Buy or borrow a certified calibrating bucket for pump checks

The DOE paper trail, in order

DC 2003-11-010 lists documents in two batches, one before construction and one before you open. The written notice to DOE-OIMB comes first and covers your business name, outlet location and business plan.[1]

  1. Notify DOE-OIMBSend written notice with your business name, outlet location and business plan before you engage in fuel retailing.
  2. Before constructionSecure an Environmental Compliance Certificate from DENR, a zoning clearance, a building permit and, if applicable, an LLDA discharge permit.
  3. Before operationGet a BFP Fire Safety Inspection Certificate and the mayor's permit, and prepare a list of pumps and tanks and a layout plan.
  4. Certificate of ComplianceWait for DOE to issue the COC. The outlet may not operate until it does.

Pumps must deliver what the meter says

Dispensing pumps may not under-deliver by more than 50 ml for every 10 litres, measured with a certified calibrating bucket.[1]

Check your pumps on a schedule, not only after a complaint. Log each check with the date, pump number and result so you have records when DOE-OIMB inspects.

How current is this rule?

DC 2003-11-010 dates from 2003. Rules and fees may have changed since then. Confirm the current requirements and the COC fee with DOE-OIMB before you spend on land or construction. Our FSIC guide and zoning clearance guide cover the local steps.

Questions people ask

Can I open a gasoline station on a small lot?
DC 2003-11-010 sets an initial minimum lot area of 100 square metres for approved premises.
Do I need an ECC for a gas station?
DOE lists an Environmental Compliance Certificate from DENR among the documents needed before construction.
How much is the DOE Certificate of Compliance?
The circular we used does not state a fee. Ask DOE-OIMB for the current amount.
What happens if I operate without a COC?
Under DC 2003-11-010, operating a retail outlet without a Certificate of Compliance is illegal trading.

Sources

Checked 13 November 2026. We link the agency's own page for every requirement. Rules change; confirm with the office before you pay.

  1. DOE Department Circular No. DC 2003-11-010: Rules and Regulations Governing the Business of Retailing Liquid Petroleum Products · Lawyerly (text of DOE circular) · 14 November 2003

The extra permits, in one table

Permit or registrationAgencyWhen it appliesFee
Prior written notice to DOE-OIMB before engaging in fuel retailing[1]DOE (Oil Industry Management Bureau)alwaysNot published
DOE Certificate of Compliance (COC) before the retail outlet operates[1]DOE (Oil Industry Management Bureau)alwaysNot published
Environmental Compliance Certificate (ECC) before construction (listed DOE requirement)[1]DENRbefore constructionNot published
Fire Safety Inspection Certificate (FSIC) before commencement of operation (listed DOE requirement)[1]BFPbefore operationNot published
Minimum lot area of 100 sq m; vehicles served inside the premises[1]DOEalwaysnot applicable
Pump accuracy: under-delivery must not exceed 50 ml per 10 litres[1]DOEalwaysnot applicable

Plan it for your city: Permit Path for gasoline station.